Files
E300-IPP/README.md
Patrick McDonagh 01967b1727 Auto-Setup Files
Changed project name to IPP, added files to automatically configure PLC
2016-09-23 13:18:06 -05:00

28 lines
993 B
Markdown

# Intelligent Pump Panel
## Developed by Henry Pump
# Device_Status_INT Mapping
| Integer | String |
|---------------|---------------------------------------|
| 1 | Startup |
| 2 | Not ready to start |
| 3 | Ready to start |
| 4 | Lost run permissive |
| 5 | Not able to restart - Overload Limit |
| 6 | Not able to restart - Trip Limit |
| 7 | Waiting to attempt restart |
| 8 | Waiting to attempt restart (Overload) |
| 9 | Running |
| 10 | User stopped |
| 11 | Waiting to start (Timer Mode) |
# IP Address Table
| Device | IP Address |
|------------------------------ |------------------------------ |
| CloudConnect (M1) | 192.168.1.1 |
| PLC (Micro820) | 192.168.1.5 |
| HMI (Panelview 800) | 192.168.1.6 |
| Overload Relay (E300) | 192.168.1.9 |