Rainer Clasen 41d57c5d26 fix PWX export: handle end of gaps gracefully.
As I got it pwx by itself has no concept of recording intervals. "smart
recording" and other strange data require variable recoring intervals.

On the other hand it's not recording the duration of a sample explicitly.
This means the duration needs to be derived from the previous samples
timestamp (assuming the sample timestamps are referring to the end of the
sampled period).

This diff writes an empty timestamp at the end of each gap so that the
next real sample/ridepoint can calculate the correct duration.

Please note that this may unhide some deficiencies in GCs file reading in
exports.
2013-08-26 22:46:14 +02:00
2013-03-31 18:11:53 +01:00
2013-08-13 19:53:55 -04:00
2013-03-14 22:53:37 +00:00
2012-12-03 12:00:12 +00:00
2013-07-18 08:37:42 +01:00
2013-08-07 19:18:11 +01:00
2009-09-20 11:13:11 -07:00
2011-10-12 09:46:40 +01:00
2006-09-06 23:59:42 +00:00
2013-02-28 07:16:10 +00:00
2013-03-08 17:20:41 -05:00
2012-11-08 22:24:13 +00:00

Golden Cheetah install and build instructions are documented
for each platform;

INSTALL-WIN32   For building on Microsoft Windows
INSTALL-LINUX   For building on Ubuntu Linux
INSTALL-MAC     For building on Apple OS X

Alternatively official builds are available from http://www.goldencheetah.org
whilst latest developer builds are available from http://goldencheetah.stand2surf.net
Languages
Standard ML 68.3%
C++ 28.1%
C 2.7%
Yacc 0.2%
QMake 0.2%
Other 0.1%